Radar > 394161

YLB to install a pilot plant for cathodes for lithium battery production in 2025

YLB planea instalar planta piloto de cátodos para producción de baterías de litio en 2025

Intel ID : 394161

Intel ID 394161
Value ND
Native Currency Bolivian Boliviano (BOB)
Exchange Rate:
Financial Data - YLB - Yacimientos de Litio Bolivianos
(31 Dec 2020)

Exchange Rate:
Date
Country
Geography
Subsector (Old TTR Sectors)
Primary Subsector (TTRSC)
55.05.08 Specialty Metals & Minerals (Primary)
55 Raw Materials & Natural Resources / 55.05 Metal & Mineral Resources

20.03.06 Energy Storage Equipment, Products & Systems (Primary)
20 Energy & Utilities / 20.03 Power Generation & Electric Utilities

Type
Intel Grade
Source
Tags

Bidder

Name
verified
Subsector (Old TTR Sectors)
Industry / Steel, Metallurgy and Industrial Production (Primary)
Energy and Renewable Energies / Electric
Primary Sector (TTRSC)
20.03.06 Energy Storage Equipment, Products & Systems
20 Energy & Utilities / 20.03 Power Generation & Electric Utilities

Country
Website
Description

Bidder

Name
verified
Subsector (Old TTR Sectors)
Natural Resources / Mining (Primary)
Primary Sector (TTRSC)
55.05.08 Specialty Metals & Minerals
55 Raw Materials & Natural Resources / 55.05 Metal & Mineral Resources

Country
Website
Description

Legend:

verified Verified: Confirmed as a party to an active or possible transaction.

potential Potential: Unconfirmed as a party to an active or possible transaction.

retained Retained: Confirmed as “Retained” with a general or specific mandate.

prospect Prospect: Advisory “Prospect” in discussions with or pitching services to possible client.

Transactional data is continuously updated by the research team and therefore is subject to change.