ProInversión to launch tender for Puerto Maldonado wastewater treatment plant project in 2Q23, with USD 88m investment
ProInversión lanzará licitación para proyecto de planta de tratamiento de aguas residuales de Puerto Maldonado en el segundo trimestre de 2023, con inversión de USD 88m
Intel ID : 362581
|
||||
| Intel ID | 362581 | |
| Value | EUR 80,50m | |
| Native Currency |
US Dollar (USD)
Exchange Rate: |
|
| Date |
|
|
| Country | ![]() |
|
| Geography | ![]() |
|
| Subsector (Old TTR Sectors) |
|
|
| Primary Subsector (TTRSC) |
25.01.99 Other Banking & Investment (Primary) 25 Financial Services / 25.01 Banking & Investment |
|
| Type |
|
|
| Intel Grade |
|
|
| Source |
|
|
| Tags | ![]() |
Seller
| Name |
|
||
| Subsector (Old TTR Sectors) |
|
||
| Primary Sector (TTRSC) |
35.03.03 Construction & Engineering (Non Residential) 35 Industrials / 35.03 Construction & Engineering |
||
| Secondary Sectors (TTRSC) |
35.09.03 Railway Infrastructure 35 Industrials / 35.09 Transport Infrastructure |
||
| Country |
|
||
| Website |
|
||
| Description |
|
Legend:
Verified: Confirmed as a party to an active or possible transaction.
Potential: Unconfirmed as a party to an active or possible transaction.
Retained: Confirmed as “Retained” with a general or specific mandate.
Prospect: Advisory “Prospect” in discussions with or pitching services to possible client.
Transactional data is continuously updated by the research team and therefore is subject to change.