Parador Atalaya build a bakery products production plant in Chascomús with USD 1m investment
Parador Atalaya construirá planta de producción de productos de panadería en Chascomús con una inversión de USD 1m
Intel ID : 410157
|
Intel ID | 410157 | ||||
Value | EUR 0,97m | ||||
Native Currency |
US Dollar (USD)
Exchange Rate: ![]() |
||||
Date |
![]() |
||||
Country | ![]() |
||||
Geography | ![]() |
||||
Subsector (Old TTR Sectors) |
|
||||
Primary Subsector (TTRSC) |
15.02.03 Carbonated Beverages (Primary) 15 Consumer Products & Services / 15.02 Beverages 35.10.14 Vehicle Rental Services (Primary) 35 Industrials / 35.10 Transportation & Logistics 15.10.07 Restaurants, Bars & Nightlife (Primary) 15 Consumer Products & Services / 15.10 Travel, Hospitality & Leisure |
||||
Secondary Subsectors (TTRSC) |
15.02.04 Coffee & Tea 15 Consumer Products & Services / 15.02 Beverages 15.02.06 Fruit-based Beverages 15 Consumer Products & Services / 15.02 Beverages 15.02.07 Water & Ice 15 Consumer Products & Services / 15.02 Beverages |
||||
Type |
![]() |
||||
Intel Grade |
![]() |
||||
Source |
![]() |
||||
Tags | ![]() |
Bidder
Name |
|
||
Subsector (Old TTR Sectors) |
|
||
Primary Sector (TTRSC) |
15.10.07 Restaurants, Bars & Nightlife 15 Consumer Products & Services / 15.10 Travel, Hospitality & Leisure |
||
Country |
![]() |
||
Website |
![]() |
||
Description |
![]() |
Legend:
Verified: Confirmed as a party to an active or possible transaction.
Potential: Unconfirmed as a party to an active or possible transaction.
Retained: Confirmed as “Retained” with a general or specific mandate.
Prospect: Advisory “Prospect” in discussions with or pitching services to possible client.
Transactional data is continuously updated by the research team and therefore is subject to change.