NEUMAN & ESSER to build the first green hydrogen plant in Magallanes after being awarded
NEUMAN & ESSER se adjudica la construcción de la primera planta de hidrógeno verde en Magallanes
NEUMAN & ESSER ganha a construção da primeira planta de hidrogênio verde em Magalhães
Intel ID : 389792
| Intel ID | 389792 | |||
| Value | ND | |||
| Native Currency |
Chilean Peso (CLP)
Exchange Rate: |
|||
| Date |
|
|||
| Country | ![]() |
|||
| Geography | ![]() |
|||
| Subsector (Old TTR Sectors) |
|
|||
| Primary Subsector (TTRSC) |
35.06.01 Heavy Machinery & Equipment Distribution (Primary) 35 Industrials / 35.06 Industrial Services 20.02.02 Multiline Oil & Gas (Primary) 20 Energy & Utilities / 20.02 Oil, Gas & Consumable Fuels |
|||
| Secondary Subsectors (TTRSC) |
20.04.05 Hydrogen 20 Energy & Utilities / 20.04 Renewable Energy |
|||
| Type |
|
|||
| Intel Grade |
|
|||
| Source |
|
|||
| Tags | ![]() |
Bidder
| Name |
|
||
| Subsector (Old TTR Sectors) |
|
||
| Primary Sector (TTRSC) |
20.02.02 Multiline Oil & Gas 20 Energy & Utilities / 20.02 Oil, Gas & Consumable Fuels |
||
| Secondary Sectors (TTRSC) |
20.04.05 Hydrogen 20 Energy & Utilities / 20.04 Renewable Energy |
||
| Country |
|
||
| Website |
|
||
| Description |
|
Bidder
| Name |
|
||
| Subsector (Old TTR Sectors) |
|
||
| Primary Sector (TTRSC) |
35.06.01 Heavy Machinery & Equipment Distribution 35 Industrials / 35.06 Industrial Services |
||
| Country |
|
||
| Website |
|
||
| Description |
|
Legend:
Verified: Confirmed as a party to an active or possible transaction.
Potential: Unconfirmed as a party to an active or possible transaction.
Retained: Confirmed as “Retained” with a general or specific mandate.
Prospect: Advisory “Prospect” in discussions with or pitching services to possible client.
Transactional data is continuously updated by the research team and therefore is subject to change.
