Radar > 352702

Goldwind planning to install wind turbine factory in Brazil

Goldwind planeja instalar fábrica de turbinas eólicas no país

Intel ID : 352702

Intel ID 352702
Value ND
Native Currency Brazilian Real (BRL)
Exchange Rate:
Date
Country
Geography
Subsector (Old TTR Sectors)
Primary Subsector (TTRSC)
20.04.09 Wind Power (Primary)
20 Energy & Utilities / 20.04 Renewable Energy

Type
Intel Grade
Source
Tags

Bidder

Name
verified
Subsector (Old TTR Sectors)
Industry / Steel, Metallurgy and Industrial Production (Primary)
Energy and Renewable Energies / Wind
Country
Website
Description

Legend:

verified Verified: Confirmed as a party to an active or possible transaction.

potential Potential: Unconfirmed as a party to an active or possible transaction.

retained Retained: Confirmed as “Retained” with a general or specific mandate.

prospect Prospect: Advisory “Prospect” in discussions with or pitching services to possible client.

Transactional data is continuously updated by the research team and therefore is subject to change.