Radar > 397756

Celsia to inaugurate the second section of the Toluviejo substation by the end of 2024

Celsia planea inaugurar segundo tramo de la subestación Toluviejo para finales de 2024

Intel ID : 397756

Bidder

Celsia
Colombia

Intel ID 397756
Value ND
Native Currency Colombian Peso (COP)
Exchange Rate:
Financial Data - Celsia
(31 Dec 2014)
Revenue: EUR 0,81m
EBITDA: EUR 0,28m
Exchange Rate:
Date
Country
Geography
Subsector (Old TTR Sectors)
Primary Subsector (TTRSC)
20.03.05 Electric Utilities (Primary)
20 Energy & Utilities / 20.03 Power Generation & Electric Utilities

Secondary Subsectors (TTRSC)
20.02.05 Oil & Gas Exploration & Production (Upstream)
20 Energy & Utilities / 20.02 Oil, Gas & Consumable Fuels

20.04.08 Solar Power
20 Energy & Utilities / 20.04 Renewable Energy

Type
Intel Grade
Source
Tags

Bidder

Name
verified
Subsector (Old TTR Sectors)
Energy and Renewable Energies / Electric (Primary)
Primary Sector (TTRSC)
20.03.05 Electric Utilities
20 Energy & Utilities / 20.03 Power Generation & Electric Utilities

Secondary Sectors (TTRSC)
20.02.05 Oil & Gas Exploration & Production (Upstream)
20 Energy & Utilities / 20.02 Oil, Gas & Consumable Fuels

20.04.08 Solar Power
20 Energy & Utilities / 20.04 Renewable Energy

Country
Website
Description

Legend:

verified Verified: Confirmed as a party to an active or possible transaction.

potential Potential: Unconfirmed as a party to an active or possible transaction.

retained Retained: Confirmed as “Retained” with a general or specific mandate.

prospect Prospect: Advisory “Prospect” in discussions with or pitching services to possible client.

Transactional data is continuously updated by the research team and therefore is subject to change.