Capstone Copper invests USD 150m to optimize processes for the production of cobalt from Mantoverde in Atacama
Capstone Copper anuncia inversión de USD 150m para optimizar procesos para la producción de cobalto de Mantoverde en Atacama
Intel ID : 388545
|
Intel ID | 388545 | |
Value | EUR 137,39m | |
Native Currency |
US Dollar (USD)
Exchange Rate: ![]() |
|
Date |
![]() |
|
Country | ![]() |
|
Geography | ![]() |
|
Subsector (Old TTR Sectors) |
|
|
Primary Subsector (TTRSC) |
55.05.02 Copper & Cobalt Mining & Refining (Primary) 55 Raw Materials & Natural Resources / 55.05 Metal & Mineral Resources |
|
Type |
![]() |
|
Intel Grade |
![]() |
|
Source |
![]() |
|
Tags | ![]() |
Bidder
Name |
|
||
Subsector (Old TTR Sectors) |
|
||
Primary Sector (TTRSC) |
55.05.02 Copper & Cobalt Mining & Refining 55 Raw Materials & Natural Resources / 55.05 Metal & Mineral Resources |
||
Country |
![]() |
||
Website |
![]() |
||
Description |
![]() |
Legend:
Verified: Confirmed as a party to an active or possible transaction.
Potential: Unconfirmed as a party to an active or possible transaction.
Retained: Confirmed as “Retained” with a general or specific mandate.
Prospect: Advisory “Prospect” in discussions with or pitching services to possible client.
Transactional data is continuously updated by the research team and therefore is subject to change.