Radar > 359201

Capital Energy awards Gestacur the construction of its first wind park in Castilla-La Mancha for EUR 53m

Capital Energy adjudica a Gestacur la construcción de su primer parque eólico en Castilla-La Mancha por EUR 53m

Intel ID : 359201

Relevant Documents


Intel ID 359201
Value EUR 53,00m
Native Currency Euro (EUR)
Financial Data - Capital Energy
(31 Dec 2023)
Revenue: EUR 2,77m
Net Debt: EUR 7,21m
People: 16
Date
Country
Geography
Subsector (Old TTR Sectors)
Primary Subsector (TTRSC)
35.03.03 Construction & Engineering (Non Residential) (Primary)
35 Industrials / 35.03 Construction & Engineering

20.04.09 Wind Power (Primary)
20 Energy & Utilities / 20.04 Renewable Energy

Type
Intel Grade
Source
Tags

Bidder

Name
verified
Subsector (Old TTR Sectors)
Energy and Renewable Energies / Solar (Primary)
Energy and Renewable Energies / Hydraulic
Primary Sector (TTRSC)
20.04.08 Solar Power
20 Energy & Utilities / 20.04 Renewable Energy

Secondary Sectors (TTRSC)
20.04.99 Other Renewable Energy
20 Energy & Utilities / 20.04 Renewable Energy

Country
Website
Description

Bidder

Name
verified
Subsector (Old TTR Sectors)
Real Estate and Construction / Construction (Materials and Machinery) (Primary)
Primary Sector (TTRSC)
35.03.03 Construction & Engineering (Non Residential)
35 Industrials / 35.03 Construction & Engineering

Country
Website
Description

Legend:

verified Verified: Confirmed as a party to an active or possible transaction.

potential Potential: Unconfirmed as a party to an active or possible transaction.

retained Retained: Confirmed as “Retained” with a general or specific mandate.

prospect Prospect: Advisory “Prospect” in discussions with or pitching services to possible client.

Transactional data is continuously updated by the research team and therefore is subject to change.