Radar > 239468

ASA plans private concession for airport terminals

ASA planea concesión privada para terminales aeroportuarias

Intel ID : 239468
Synopsis

Aeropuertos y Servicios Auxiliares (ASA), a Mexico-based federal airport operator, plans to draw up a study which will detail the Mexican airport terminals that could be given under concession to private companies, reported El Financiero on 8 August 2016, citing ASA Managing Director Alfonso Sarabia.

Sarabia noted the study will be published before the end of 2016 and added the aim of the concessions will be to drive the development of those airport terminals.

Currently, ASA operates a network of 18 airports.
(content in spanish)

Aeropuertos y Servicios Auxiliares (ASA), operadora federal mexicana de aeropuertos, planea realizar un estudio que detalle las terminales aeroportuarias mexicanas que podría dar en concesión a empresas privadas, ha publicado El Financiero el 8 de agosto de 2016, citando al director general de ASA, Alfonso Sarabia.

Sarabia ha señalado que el estudio se publicará antes del final de 2016 y ha añadido que el objetivo de las concesiones es fomentar el desarrollo de esas terminales aéreas.

Actualmente, ASA opera una red de 18 aeropuertos.

Intel ID 239468
Value ND
Native Currency Mexican Peso (MXN)
Exchange Rate:
Date
Country
Region
Continent
Geography
Subsector (Old TTR Sectors)
Type
Intel Grade
Source
Tags

Seller

Name
verified
Subsector (Old TTR Sectors)
Services and Distribution / Transport, Aviation and Logistics (Primary)
Primary Sector (TTRSC)
35.09.01 Aerodromes & Airports
35 Industrials / 35.09 Transport Infrastructure

Country
Website
Description

Legend:

verified Verified: Confirmed as a party to an active or possible transaction.

potential Potential: Unconfirmed as a party to an active or possible transaction.

retained Retained: Confirmed as “Retained” with a general or specific mandate.

prospect Prospect: Advisory “Prospect” in discussions with or pitching services to possible client.

Transactional data is continuously updated by the research team and therefore is subject to change.