ACS, through UGL, wins contract to design and build second phase of Western Downs battery plant in Queensland
ACS, a través de UGL, se adjudica el diseño y construcción de segunda fase de planta de baterías Western Downs en Queensland
Intel ID : 398686
Intel ID | 398686 | ||
Value | ND | ||
Native Currency |
Australian Dollar (AUD)
Exchange Rate: ![]() |
||
Date |
![]() |
||
Country | ![]() |
||
Geography | ![]() |
||
Subsector (Old TTR Sectors) |
|
||
Primary Subsector (TTRSC) |
35.03.03 Construction & Engineering (Non Residential) (Primary) 35 Industrials / 35.03 Construction & Engineering |
||
Type |
![]() |
||
Intel Grade |
![]() |
||
Source |
![]() |
||
Tags | ![]() |
Bidder
Name |
|
||
Subsector (Old TTR Sectors) |
|
||
Primary Sector (TTRSC) |
35.03.03 Construction & Engineering (Non Residential) 35 Industrials / 35.03 Construction & Engineering |
||
Secondary Sectors (TTRSC) |
35.03.99 Other Construction & Engineering 35 Industrials / 35.03 Construction & Engineering |
||
Country |
![]() |
||
Website |
![]() |
||
Description |
![]() |
Ultimate Owner (Buyer)
Name |
|
||
Subsector (Old TTR Sectors) |
|
||
Primary Sector (TTRSC) |
35.03.03 Construction & Engineering (Non Residential) 35 Industrials / 35.03 Construction & Engineering |
||
Country |
![]() |
||
Website |
![]() |
||
Description |
![]() |
Ultimate Owner (Buyer)
Name |
|
|||
Subsector (Old TTR Sectors) |
|
|||
Primary Sector (TTRSC) |
30.03.08 Hospitals 30 Healthcare / 30.03 Healthcare Facilities & Services |
|||
Secondary Sectors (TTRSC) |
35.09.01 Aerodromes & Airports 35 Industrials / 35.09 Transport Infrastructure 35.09.05 Toll Bridges, Roads & Highways 35 Industrials / 35.09 Transport Infrastructure |
|||
Country |
![]() |
|||
Website |
![]() |
|||
Description |
![]() |
Legend:
Verified: Confirmed as a party to an active or possible transaction.
Potential: Unconfirmed as a party to an active or possible transaction.
Retained: Confirmed as “Retained” with a general or specific mandate.
Prospect: Advisory “Prospect” in discussions with or pitching services to possible client.
Transactional data is continuously updated by the research team and therefore is subject to change.