GreenYellow, Enersim and Oeste Solar to build two solar plants in Mato Grosso
GreenYellow, Enersim e Oeste Solar construirá duas usinas solares no Mato Grosso
Intel ID : 396017
|
||||
| Intel ID | 396017 | |||||
| Value | ND | |||||
| Native Currency |
Brazilian Real (BRL)
Exchange Rate: |
|||||
| Date |
|
|||||
| Country | ![]() |
|||||
| Geography | ![]() |
|||||
| Subsector (Old TTR Sectors) |
|
|||||
| Primary Subsector (TTRSC) |
20.04.08 Solar Power (Primary) 20 Energy & Utilities / 20.04 Renewable Energy 20.04.07 Renewable Energy Equipment (Primary) 20 Energy & Utilities / 20.04 Renewable Energy |
|||||
| Type |
|
|||||
| Intel Grade |
|
|||||
| Source |
|
|||||
| Tags | ![]() |
Target
| Name |
|
|||
| Subsector (Old TTR Sectors) |
|
|||
| Primary Sector (TTRSC) |
20.04.07 Renewable Energy Equipment 20 Energy & Utilities / 20.04 Renewable Energy |
|||
| Country |
|
|||
| Description |
|
Target
| Name |
|
||
| Subsector (Old TTR Sectors) |
|
||
| Primary Sector (TTRSC) |
20.04.08 Solar Power 20 Energy & Utilities / 20.04 Renewable Energy |
||
| Country |
|
||
| Website |
|
||
| Description |
|
Target
| Name |
|
|||
| Subsector (Old TTR Sectors) |
|
|||
| Primary Sector (TTRSC) |
20.04.08 Solar Power 20 Energy & Utilities / 20.04 Renewable Energy |
|||
| Country |
|
|||
| Description |
|
Legend:
Verified: Confirmed as a party to an active or possible transaction.
Potential: Unconfirmed as a party to an active or possible transaction.
Retained: Confirmed as “Retained” with a general or specific mandate.
Prospect: Advisory “Prospect” in discussions with or pitching services to possible client.
Transactional data is continuously updated by the research team and therefore is subject to change.
