Duro Felguera wins the construction of process plant at silver mine in Morocco for USD 78m
Duro Felguera se adjudica la construcción de una planta de proceso en una mina de plata de Marruecos por USD 78m
Intel ID : 354893
| Intel ID | 354893 | ||
| Value | EUR 74,33m | ||
| Native Currency |
US Dollar (USD)
Exchange Rate: |
||
|
Financial Data - Duro Felguera
(31 Dec 2023) |
Revenue: EUR 282,84m Net Debt: EUR 136,89m People: 1386 |
||
| Date |
|
||
| Country | ![]() |
||
| Geography | ![]() |
||
| Subsector (Old TTR Sectors) |
|
||
| Primary Subsector (TTRSC) |
35.03.99 Other Construction & Engineering (Primary) 35 Industrials / 35.03 Construction & Engineering 55.05.07 Silver Mining & Refining (Primary) 55 Raw Materials & Natural Resources / 55.05 Metal & Mineral Resources |
||
| Type |
|
||
| Intel Grade |
|
||
| Source |
|
||
| Tags | ![]() |
Bidder
| Name |
|
|||
| Subsector (Old TTR Sectors) |
|
|||
| Primary Sector (TTRSC) |
35.03.03 Construction & Engineering (Non Residential) 35 Industrials / 35.03 Construction & Engineering |
|||
| Secondary Sectors (TTRSC) |
35.06.02 Industrial Maintenance & Repair Services 35 Industrials / 35.06 Industrial Services 35.10.11 Supply Chain Logistics 35 Industrials / 35.10 Transportation & Logistics 40.03.08 IT Security & Biometrics 40 Information Technology / 40.03 Internet, Software & IT Services |
|||
| Country |
|
|||
| Website |
|
|||
| Description |
|
Legend:
Verified: Confirmed as a party to an active or possible transaction.
Potential: Unconfirmed as a party to an active or possible transaction.
Retained: Confirmed as “Retained” with a general or specific mandate.
Prospect: Advisory “Prospect” in discussions with or pitching services to possible client.
Transactional data is continuously updated by the research team and therefore is subject to change.
