Radar > 363073

Duro Felguera renewable energy branch wins contract to build three photovoltaic plants in Cuenca

La filial de energía renovable de Duro Felguera se adjudica la construcción de tres plantas fotovoltaicas en Cuenca

Intel ID : 363073

Bidder


Intel ID 363073
Value ND
Native Currency Euro (EUR)
Financial Data - Duro Felguera
(31 Dec 2023)
Revenue: EUR 282,84m
Net Debt: EUR 136,89m
People: 1386
Date
Country
Geography
Subsector (Old TTR Sectors)
Primary Subsector (TTRSC)
35.03.03 Construction & Engineering (Non Residential) (Primary)
35 Industrials / 35.03 Construction & Engineering

20.04.08 Solar Power (Primary)
20 Energy & Utilities / 20.04 Renewable Energy

Type
Intel Grade
Source
Tags

Bidder

Name
verified
Subsector (Old TTR Sectors)
Services and Distribution / Consultancy, Audit and Engineering (Primary)
Industry / Steel, Metallurgy and Industrial Production
Technology and Telecoms / Technology
Primary Sector (TTRSC)
35.03.03 Construction & Engineering (Non Residential)
35 Industrials / 35.03 Construction & Engineering

Secondary Sectors (TTRSC)
35.06.02 Industrial Maintenance & Repair Services
35 Industrials / 35.06 Industrial Services

35.10.11 Supply Chain Logistics
35 Industrials / 35.10 Transportation & Logistics

40.03.08 IT Security & Biometrics
40 Information Technology / 40.03 Internet, Software & IT Services

Country
Website
Description

Legend:

verified Verified: Confirmed as a party to an active or possible transaction.

potential Potential: Unconfirmed as a party to an active or possible transaction.

retained Retained: Confirmed as “Retained” with a general or specific mandate.

prospect Prospect: Advisory “Prospect” in discussions with or pitching services to possible client.

Transactional data is continuously updated by the research team and therefore is subject to change.